Secondary school (Rai-Alexandrovka village)
The design and estimate documentation for the capital repair of the school in the village was completed Rai-Alexandrovka of the Slavic district of the Donetsk region.
3566
wp-singular,portfolio_page-template-default,single,single-portfolio_page,postid-3566,wp-theme-bridge,bridge-core-3.3.4.8,qode-page-transition-enabled,ajax_updown_fade,page_not_loaded,,vertical_menu_enabled,qode_grid_1300,side_area_uncovered_from_content,qode-theme-ver-30.8.8.8,qode-theme-bridge,disabled_footer_top,qode_header_in_grid,qode-wpml-enabled,qode-portfolio-single-template-1,wpb-js-composer js-comp-ver-8.7.3,vc_responsive
 

Secondary school (Rai-Alexandrovka village)

Chief Architect:

Dashevskiy A. B.

Location:

Rai-Alexandrovka village, Slavyansk district, Donetsk region

About This Project

The design and estimate documentation for the capital repair of the school in the village was completed Rai-Alexandrovka of the Slavic district of the Donetsk region.

 

The project provides for:

 

  • insulation of external walls with mineral wool boards;
  • warming of the basement part of the building;
  • installation of metal water outlets;
  • replacement of the roof from wavy asbestos-cement sheets to metal roofing;
  • replacement of existing window and door blocks;
  • arrangement of canopies over input groups.